Specifications
| Customization | Available |
| Interface Type | USB |
| Connector | USB |
| Universal | Universal |
| Cable Length | <4 Feet |
| Switch | Without Switch |
| Data Transmission Function | Data Transmission Function |
| Retractable | Retractable |
| Charging Function | Charging Function |
| IC Chip | Without IC Chip |
| Customized | Customized |
| Product Material | ABS |
| Product Packaging | Cardboard Box |
| Length | 1.1m |
| Copper Wire Specifications | 4-Core Wire 55+55+16+16 |
| Compatible with Mobile Phones | Type-C, Android/Apple |
| Transport Package | Original Packaging |
| Specification | 158*90*25mm |
| Trademark | OEM |
| Origin | China |
| HS Code | 8473309000 |
| Production Capacity | 100000000 |
| Package Size | 49.00cm * 30.50cm * 29.00cm |
| Package Gross Weight | 16.000kg |
| Accepted Delivery Terms | FOB,CFR,CIF,EXW,FAS,DDP,DDU,Express Delivery; |
| Accepted Payment Currency | USD,EUR,HKD,CNY; |
| Accepted Payment Type | T/T,MoneyGram,PayPal,Western Union; |
| Language Spoken | English,Chinese,Spanish,Japanese,German,French |
| Category | USB-C Cables |
| Manufacturer | Shenzhen Yuntan Technology Co., Ltd. |
Detailed parameters
| Item | Promotional Charging Cable |
|---|
| Materials | Plastic/Metal or customized |
|---|
| Size | 90CM/100CM/120CM/160CM/180CM/200CM OR customized |
|---|
| Printing | silk screen or customized logo |
|---|
| Usage | Promotional product/ camping sport/Exhibition etc. |
Description
Gifts Personalized New USB Type C Fast Charging Cable Long Leads 1m, 1.2m, 1.3m Customized Logo is listed in usb-c cables (Cables, Hubs & Adapters).
Key details
- Length: 1.1m
- Interface Type: USB
- Connector: USB
- Universal: Universal
- Cable Length: <4 Feet
- Switch: Without Switch
- Data Transmission Function: Data Transmission Function
- Retractable: Retractable
The supplier lists this product. The specifications reflect the information publicly displayed on the listing. Cable Length: <4 Feet. Product Material: ABS. Length: 1.1m. Production Capacity: 100000000. Package Size: 49.00cm * 30.50cm * 29.00cm. Package Gross Weight: 16.000kg.
Ordering through ToyBox UAE
Minimum order is 20 pieces at US$1.66 – 2.56 per piece. Send one inquiry and ToyBox UAE confirms compatibility with your device, price, lead time and shipping with the factory, inspects the goods and delivers them to you in the UAE or abroad.
Request a quote for this product